Understanding Industrial All Risk Insurance Policy in India: A Comprehensive Guide

Brokerage Free Team •November 15, 2024 | 6 min read • 634 views

 

In today’s volatile industrial landscape, comprehensive protection against unforeseen incidents is essential for maintaining financial stability. Industrial All Risk (IAR) Insurance Policy is a powerful tool designed specifically for large industries to safeguard against an extensive range of risks. This article delves into what makes IAR policies a cornerstone of industrial insurance in India, exploring its coverages, sum insured aspects, add-on covers, exclusions, and loss settlement basis.

What is an Industrial All Risk Insurance Policy?

 

An Industrial All Risk Insurance Policy is a robust, all-inclusive policy aimed at providing extensive coverage to large-scale industries, including manufacturing plants, power companies, refineries, and more. It is a package policy covering both material damage and business interruption, shielding businesses from property damage, machinery breakdowns, and revenue loss due to operational disruptions. The IAR policy is especially relevant in India, where the industrial sector is prone to various risk factors like fire, natural calamities, machinery failures, and extended downtimes. By minimizing financial losses in such scenarios, the IAR policy enables industries to operate confidently and consistently.

 

What are the Coverages in an Industrial All Risk Insurance Policy?

 

An IAR policy in India generally consists of two main sections:

 

1. Material Damage (MD) Coverage:

  • Covers physical damage or loss to assets like buildings, machinery, stocks, and other property due to perils such as fire, flood, theft, and natural disasters.
  • Includes both accidental damage and sudden, unforeseen breakdowns of machinery, which is particularly vital for high-capital industries.

 

2. Business Interruption (BI) Coverage:

  • Provides financial support for loss of profits due to an insured event leading to disruption or cessation of business activities.
  • Covers additional expenses necessary to restore the business operations post-interruption, such as temporary rentals, relocation, and overtime wages.

 

These sections together make IAR policies comprehensive solutions, shielding industries from direct physical damages as well as revenue impacts.

 

What is the Sum Insured under the Material Damage Section?

 

In the Material Damage (MD) section, the sum insured typically aligns with the *replacement value* of the insured property. This valuation approach means the policyholder is compensated to replace or reinstate damaged assets with similar or equivalent new items without deducting for depreciation. In India, setting the sum insured accurately is crucial to avoid underinsurance penalties, which could result in proportionately reduced claim settlements. Many Indian industries opt for regular valuations to ensure their sum insured reflects current replacement costs, a vital step given fluctuating market prices and currency values.

 

What is the Sum Insured under the Business Interruption Section?

 

The Business Interruption (BI) section's sum insured generally covers the *gross profit* of the business, taking into account anticipated earnings and any fixed operating costs that would continue despite the operational halt. The sum insured is commonly based on historical financial data, adjusted for growth or inflation, to represent realistic revenue projections. In India, where industries like oil, steel, and textiles experience significant revenue dependency on consistent operations, ensuring adequate BI coverage can be instrumental in managing cash flow during extended downtimes.

 

Add-On Covers under the Material Damage Section

 

The Material Damage section of an IAR policy in India can be tailored with various add-on covers to enhance the policy's scope. Some popular add-ons include:

 

1. Debris Removal Costs: Covers expenses incurred for clearing debris post-damage.

2. Architect’s Fees: Covers professional fees for architects or consultants needed for property repairs or reconstruction.

3. Escalation Clause: Accounts for inflation-related cost increases in materials or labor during the policy period.

4. Temporary Removal Cover: Protects property while temporarily relocated, often used during renovation or equipment servicing.

 

These add-ons are critical for Indian industries facing high reconstruction costs due to inflation or needing specialized repair services.

 

Add-On Covers under the Business Interruption Section

 

Business Interruption coverage can also be expanded with valuable add-on covers, including:

 

1. Increased Cost of Working: Covers extra costs to maintain operations post-disaster, like renting temporary facilities.

2. Auditor’s Fees: Covers costs of hiring auditors to verify loss of profits, simplifying claim processes.

3. Additional Increased Cost of Working (AICOW): Extends coverage beyond standard BI limits, especially useful for businesses needing extended recovery time.

4. Alternative Supplier or Customer Coverage: Useful in industries relying heavily on key suppliers or buyers, it covers losses due to disruptions at these crucial points.

 

These add-ons address specific needs of Indian industries dependent on uninterrupted supply chains or specialized services.

 

Exclusions under the Material Damage Section

 

Despite its comprehensive nature, IAR policies exclude certain risks, especially under the Material Damage section:

 

1. War and Nuclear Perils: Losses arising from war, terrorism, or nuclear hazards are generally excluded.

2. Intentional Damage: Damage caused deliberately by employees or owners is not covered.

3. Wear and Tear: Normal wear, gradual deterioration, and rusting of machinery are not covered.

4. Cyber Risks: Unless specifically endorsed, cyber-attacks leading to physical damage or business interruption are excluded.

 

These exclusions are designed to prevent claims for predictable or manageable risks that companies in India can often mitigate through regular maintenance or separate coverages.

 

Basis of Loss Settlement under the Material Damage Section

 

Loss settlement under the Material Damage section of IAR policies in India is typically based on the *reinstatement value* or the *indemnity value*.

 

1. Reinstatement Basis: Compensates policyholders for the full cost of repairing or replacing the damaged property with new items of a similar kind. This basis is most common in India for industries needing to reinstate operations quickly post-damage.

 

2. Indemnity Basis: Pays for the depreciated value of the damaged property, a less common approach in the IAR policy context due to lower reimbursement levels.

 

By ensuring policies are settled on an appropriate basis, insurers and policyholders can align expectations and maintain consistency in claims settlement.

 

Industrial All Risk Insurance Policy: Essential for Indian Industries

 

In the dynamic Indian industrial environment, an IAR policy acts as a financial shield, helping industries mitigate substantial risks. For example, if a large textile manufacturer in Maharashtra suffers a factory fire, the Material Damage section would cover asset replacement, while the Business Interruption section would reimburse lost profits. With strategic add-ons, companies can even cover increased costs incurred while maintaining their supply commitments, ensuring stability amid disruptions.

 

Industrial All Risk Insurance, therefore, serves as a robust financial safeguard, adapting to the needs of large Indian industries through comprehensive material damage and business interruption coverages, add-on options, and thoughtful exclusions. As India’s industrial sector continues to expand and diversify, the IAR policy stands out as an indispensable tool, protecting industries and empowering them to thrive, even in times of uncertainty.

Discussion

Results Season - Quarterly Results 2024

8 months ago | 17 min read • 12493 views

Decoding Trent's Triumph: The Impact of Zudio

9 months ago | 3 min read • 7020 views

2024 Interim Budget Highlights

10 months ago | 2 min read • 6892 views